Powerware 9390 Integrated Battery Cabinet (Models IBC-S
AChapter 2, “Battery Cabinet Installation Plan and Unpacking” – explains how to prepare the site for the installation of the battery cabinet. It discusses equipment environmental requirements,
The battery cabinet may be located to either the right or left of the UPS cabinet. This procedure assumes the battery cabinet is located to the right of the UPS cabinet. 14. If line-up-and-match installation, remove the rectangular and circular knockout on the bottom and top front side of the UPS and the IBC-SW (see Figure 9). 15.
Eaton 93PM Integrated Battery Cabinet–Small Welded Line-up-and-match battery cabinets are installed adjacent to the UPS. The IBC-SW can be installed on either the left or right side or on both sides of the UPS cabinet (see Figure 2). Figure 2. Eaton 93PM UPS and Two 93PM IBC-SWs — Various Configurations
Secure the battery wiring to the wire tie anchors (see Figure 24) using Zip ties. Route the battery cabinet ground wiring from the UPS through the bottom side inter-cabinet access pass-through (see 4.4.1 Line-Up-and-Match Power Wiring) of the UPS cabinet and IBC-SW to the IBC-SW ground terminal block.
Route the battery cabinet ground wiring from the UPS through the top of the IBC-SW to the wiring channel on the left side of the IBC-SW (see Figure 22). Route the wiring along the wiring channel to the IBC-SW ground terminal block. See Figure 23 for terminal location.
PDF includes complete article with source references for printing and offline reading.
Download detailed specifications for our photovoltaic containers, BESS systems, and mobile energy storage solutions.
Industrial Zone 15, ul. Fabryczna 24
Pabianice 95-200, Poland
+48 42 212 00 00
Monday - Friday: 8:00 AM - 5:00 PM CET